Because he’s been bemoaning the lack of updates on the Trapezoid house, some photos from this past Saturday. Ceiling hangers are going up, insulation is filling the nooks + crannies, electricians will be there next week, test floor polish has been reviewed, windows are in (with minor glass breakage!). Interior framing will start to happen soon (what little there is). Site is getting really mucky, but temporary sidewalks (i.e. pallets) do the trick.

2nd floor looking towards bedrooms
2nd floor above dining room

Staircase windows
View into living room from 2nd floor library
Main floor looking towards living area
Kitchen with lift/slide door opening to left
Study window
Exterior






Sweet. Next time I’ll bemoan not having an equivalent and see what you can do for me!