trapezoid interiors


Interior framing is going up!  Electricians are busily installing, millworkers are getting geared up, exterior cladding should start soon.  Interior partitions always come as a bit of a shock.  The single vast space is reduced to smaller areas that feel compressed despite the size of the house.  Once the boarding goes up, it’ll require another psychic shift, but all feelings of compression should be released with painting.  I never seem to get used to it, even though I know it’s coming.

Kitchen wall framing

Second floor hallway framing

Tagged ,

One thought on “trapezoid interiors

  1. gleach says:

    So when do the site tours start? :-)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 40 other followers